Unit inspection Preparation tool: Circuit tester 1. Check the resistance between connector terminals.
2. If the inspection result is not within the standard, replace the button - opener rear gate. |
Removal
1. Disconnect the ground terminal from the battery sensor, and wait for at least 60 seconds before starting work. NOTE2. Remove the cover assembly - instrument panel LWR driver. Instrument Panel Lower Cover > REMOVAL3. Remove the panel - knee guard.4. Disconnect the body integrated unit (fuse & re ...