CAUTION: Install so that the front end of the under cover (b) comes inside the bumper face - front (a), and the front end of the mud guard (c) comes outside the bumper face - front (a).
1. Install the horn assembly. Tightening torque: 18 N·m (1.8 kgf-m, 13.3 ft-lb) 2. Install the mud guard - front. 3. Lower the vehicle. 4. Connect the ground terminal to battery sensor. NOTE |
Inspection
Horn switchDtc c1242 rear left abs sensor signal
DTC DETECTING CONDITION:• A fault is detected if the time of decompression or hold exceeds the predetermined time.• A fault is detected if noise of the wheel speed sensor signal is detected.• A fault is detected if the wheel speed sensor signal is lost, or the wheel speed sensor si ...