1. Install the regulator and motor assembly - front. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 2. Install the glass assembly - front door. Front Door Glass > INSTALLATION 3. Install the sealing cover - front door. 4. Install the trim panel - front door. Door Trim > INSTALLATION 5. Connect the ground terminal to battery sensor. NOTE |
InspectionInstallation
CAUTION:• Be sure to prevent water or oil from contacting the connector terminal of secondary pressure sensor. If adhesion occurs, replace with a new part.• After installing the secondary pressure sensor, adjust the CVTF level.1. Install the secondary pressure sensor.NOTE:• Use new ...