1. Remove the V-belts. V-belt > REMOVAL 2. Remove the crank pulley. Crank Pulley > REMOVAL 3. Remove the chain cover. Chain Cover > REMOVAL 4. Remove the timing chain assembly. Timing Chain Assembly > REMOVAL 5. Remove the crank sprocket (A). |
Disassembly
1. BUSHING A - TRAILING LINKUsing the ST, push out the bushing A - trailing link.Preparation tool:ST-A: INSTALLER (899874100)ST-B: PRESS (499755602)2. BUSHING - TRAILING LINKFor the removal procedure of bushing - trailing link, refer to “Rear Axle” in the “DRIVE SHAFT SYSTEM” ...