Refer to the “SECURITY AND LOCKS” section for operation procedures of the body integrated unit. Body Integrated Unit |
Diagnostics with phenomenon inspectionInstallation
1. Before installation, check the following items.• Cable is free from deformation such as fray.• Grease is applied sufficiently to cable joints.If grease is insufficient, add it as necessary before assembling the cable.2. Install the remote assembly - door.3. Install the trim panel - fr ...