CAUTION: • Be sure to prevent water or oil from contacting the connector terminal of front wheel speed sensor. If adhesion occurs, replace with a new part. • After installing the front wheel speed sensor, adjust the CVTF level. 1. Install the front wheel speed sensor. NOTE: • Use new O-rings. • Apply CVTF to the O-rings. Tightening torque: 5 N·m (0.5 kgf-m, 3.7 ft-lb) 2. Connect the harness connector. 3. Lower the vehicle. 4. Connect the ground terminal to battery sensor. NOTE |
InspectionPreparation tool
1. GENERAL TOOLTOOL NAMEREMARKSCircuit testerUsed for measuring resistance, voltage and current.NOTE:• When measuring the standby current, prepare a circuit tester which can measure down to 1 mA.• When measuring the standby current for models with keyless access function, prepare an anal ...