Refer to “Combination Meter System” in the wiring diagram. Combination Meter System > WIRING DIAGRAM |
Inspection
1. Check that the oil flow control solenoid valve has no deformation, cracks or other damages.2. Measure the resistance between the oil control solenoid terminals.Terminal No.Standard1 and 27.4±0.5 - (when 20°C (68°F)) ...