1. Measure the resistance between connector terminals. Preparation tool: Circuit tester
2. Replace the switch assembly - door if the inspection result is not within the standard value. |
Removal
InstallationInspection
1. CHECK FUSE1. Remove the fuse and inspect visually.2. If the fuse is blown out, replace the fuse.2. CHECK RELAY1. Measure the resistance between relay terminals.Terminal No.Inspection conditionsStandardCircuit1 — 2Always1 M- or more1 — 2Apply battery voltage between terminals 4 and 3.Less than ...