1. Start and warm up the engine. 2. Depress the brake pedal, and shift the select lever to “D” range. 3. Shift the select lever to “P” or “N” range. 4. Depress the brake pedal and hold it. 5. Check “secondary pressure sensor voltage” by using Subaru Select Monitor while the engine is idling. Subaru Select Monitor > OPERATION Specification: Approx. 0.8 V 6. Check “secondary pressure sensor voltage” with engine stopped and ignition switch turned on by using Subaru Select Monitor. Subaru Select Monitor > OPERATION Specification: Approx. 0.5 V |
Removal
InstallationAdjustment
1. Remove the engine from the vehicle. Engine Assembly > REMOVAL2. Remove the chain cover. Chain Cover > REMOVAL3. When adjusting #1 and #3 cylinders(1) Remove the timing chain RH. Timing Chain Assembly > REMOVAL(2) Remove the cam carrier RH. Cam Carrier > REMOVAL(3) Measure the thickness of val ...