1. Install the power amplifier - assembly. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 2. Connect the ground terminal to battery sensor. NOTE |
RemovalInspection
STEPCHECKYESNO1.CHECK SOLENOID UNIT.Measure the resistance of solenoid unit connector terminals.TerminalsNo. 4 — No. 3:Is the resistance 27.6 — 30.5 -- AT Shift Lock Solenoid and “P” Range Switch > INSPECTIONReplace the solenoid unit. AT Shift Lock Solenoid and “P” Range ...