1. LOW-PRESSURE HOSE CAUTION: • If the hose and pipe has been replaced, add an appropriate amount of compressor oil to the compressor. Compressor Oil > ADJUSTMENT • Do not start the engine before charging refrigerant. • If the engine is started with no refrigerant charge, replace the compressor assembly. • Replace the O-rings with new parts, and then apply compressor oil. • When connecting hoses, do not apply an excessive force to them. After installing, check that no torsion or excessive tension applied to the hoses. 1. Install the hose - pressure suction. Tightening torque: Air conditioning unit: General Description > COMPONENT 2. Install the hose - pressure suction discharge. (H6 model) Tightening torque: 10 N·m (1 kgf-m, 7.4 ft-lb) 3. Connect the ground terminal to battery sensor. NOTE 4. Charge refrigerant. Refrigerant Charging Procedure > PROCEDURE 2. HIGH-PRESSURE HOSE CAUTION: • If the hose and pipe has been replaced, add an appropriate amount of compressor oil to the compressor. Compressor Oil > ADJUSTMENT • Do not start the engine before charging refrigerant. • If the engine is started with no refrigerant charge, replace the compressor assembly. • Replace the O-rings with new parts, and then apply compressor oil. • When connecting hoses, do not apply an excessive force to them. After installing, check that no torsion or excessive tension applied to the hoses. 1. Install the hose - pressure suction discharge. Tightening torque: Air conditioning unit: General Description > COMPONENT 2. Install the reservoir tank. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 3. Connect the ground terminal to battery sensor. NOTE 4. Charge refrigerant. Refrigerant Charging Procedure > PROCEDURE 3. A/C PIPE CAUTION: • If the hose and pipe has been replaced, add an appropriate amount of compressor oil to the compressor. Compressor Oil > ADJUSTMENT • Do not start the engine before charging refrigerant. • If the engine is started with no refrigerant charge, replace the compressor assembly. • Replace the O-rings with new parts, and then apply compressor oil. • When connecting pipes, do not apply an excessive force to them. After installation, check that the pipes are not damaged. 1. Install the pipe - evaporator cooling. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 2. Install the hose - pressure suction. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 3. Install the active grille shutter. (H4 model) Active Grille Shutter > INSTALLATION 4. Install the bumper face - front. Front Bumper > REMOVAL 5. Install the reservoir tank. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 6. Install the clutch pipe, connector and connector bracket. (MT model) Clutch Pipe and Hose > INSTALLATION 7. Install the air intake boot. Tightening torque: 3 N·m (0.3 kgf-m, 2.2 ft-lb) 8. Install the battery and battery box. • H4 model: Battery > INSTALLATION • H6 model: Battery > INSTALLATION 9. Connect the ground terminal to battery sensor. NOTE 10. Charge refrigerant. Refrigerant Charging Procedure > PROCEDURE |
Turn signal indicator lights
These lights show the operation of the turn
signal or lane change signal.
If the indicator lights do not blink or blink
rapidly, the turn signal bulb may be burned
out. Replace the bulb as soon as possible.
Refer to "Replacing bulbs" F11-40.
High beam indicator light
This light shows that ...