1. Install the power transistor. 2. Install the under cover assembly - passenger. 3. Connect the ground terminal to battery sensor. NOTE |
RemovalInstallation
1. Install the leak check valve assembly to the canister.Tightening torque:8 N·m (0.8 kgf-m, 5.9 ft-lb)2. Connect the drain tube (A).CAUTION:• Check that there is no damage or dust on the quick connector. If necessary, clean the seal surface of the pipe.• Make sure that the quick ...