1. GLOVE BOX LIGHT 1. Install the light - pocket. 2. Install the light - pocket cover. 3. Install the pocket assembly. 4. Connect the ground terminal to battery sensor. NOTE 2. POCKET LIGHT 1. Install the light - pocket. 2. Install the heater control assembly. 3. Connect the ground terminal to battery sensor. NOTE 3. DOOR POCKET LIGHT 1. Install the light - door pocket. 2. Install the trim panel - front door. Door Trim > INSTALLATION 3. Connect the ground terminal to battery sensor. NOTE |
RemovalDtc p0134 a/f / o2 sensor circuit no activity detected bank 1 sensor 1
DTC DETECTING CONDITION:Immediately at fault recognitionCAUTION:After servicing or replacing faulty parts, perform Clear Memory Mode Clear Memory Mode > OPERATION, and Inspection Mode Inspection Mode > PROCEDURE.WIRING DIAGRAM:• Engine Electrical System ENGINE TYPE EZ (WITHOUT PUSH BUTTON ST ...