1. Install the EGR control valve, and connect the connector to the EGR control valve. NOTE: Use a new gasket. Tightening torque: 19 N·m (1.9 kgf-m, 14.0 ft-lb) 2. Install the EGR pipe A. EGR Pipe > INSTALLATION 3. Install the air intake boot. Air Intake Boot > INSTALLATION 4. Connect the ground terminal to battery sensor. NOTE |
Inspection
Egr pipeInspection
Check the following items.• Check the oil pump for damage and wear.• Rotate the oil pump by hand, and check that it rotates smoothly.1. Measure the secondary pressure. Secondary Pressure (Line Pressure) Test > INSPECTION2. Remove the oil pan and oil strainer. Control Valve Body > REMOV ...