CAUTION: Install so that the front end of the under cover (b) comes inside the bumper face - front (a), and the front end of the mud guard (c) comes outside the bumper face - front (a).
1. Install the horn assembly. Tightening torque: 18 N·m (1.8 kgf-m, 13.3 ft-lb) 2. Install the mud guard - front. 3. Lower the vehicle. 4. Connect the ground terminal to battery sensor. NOTE |
Inspection
Horn switchCheck list for interview check
Customer’s NameInspector’s NameDate Vehicle Brought in/ /Registration No. Odometer readingkmmilesV.I.N. Date Problem Occurred/ /Registration Year/ /Weather Fine Cloudy Rainy Snowy Others:Temperature°C (°F)Road Condition Flat road Uphill Down ...