1. Disconnect the over flow hose (A) connected to the radiator filler neck from the reservoir tank. 2. Remove bolts which secure the reservoir tank, and remove the reservoir tank.
|
Reservoir tank
InspectionTerms
Packet write
This is a general term that describes
the process of writing data on-demand to
CD-R, etc., in the same way that data is
written to floppy or hard discs.
ID3 tag
This is a method of embedding trackrelated
information in an MP3 file. This
embedded informat ...