CAUTION: Be sure to prevent water or oil from contacting the connector terminal of primary speed sensor. If adhesion occurs, replace with a new part. 1. Install the primary speed sensor. NOTE: • Use new O-rings. • Apply CVTF to the O-rings. Tightening torque: 5 N·m (0.5 kgf-m, 3.7 ft-lb) 2. Connect the harness connector. 3. Install the harness stay. Tightening torque: 16 N·m (1.6 kgf-m, 11.8 ft-lb) 4. Install the air intake boot. Air Intake Boot > INSTALLATION 5. Connect the ground terminal to battery sensor. NOTE 6. Install the collector cover. |
Inspection
Rear drive shaftRemoval
1. Remove the trim panel - rear gate UPR.(1) Remove the claws on the trim edge.(2) Release the claws in the center of trim, and remove the trim panel - rear gate UPR.2. Remove the trim panel - rear gate pillar side.(1) Disconnect the rod - power rear gate before removing the trim panel - rear gate p ...