1. Install the auto headlight beam leveler CM. Tightening torque: 7.5 N·m (0.8 kgf-m, 5.5 ft-lb) 2. Install the relay holder. 3. Install the panel - knee guard. Tightening torque: 7 N·m (0.7 kgf-m, 5.2 ft-lb) 4. Install the cover assembly - instrument panel LWR driver. 5. Connect the ground terminal to battery sensor. NOTE 6. Perform initialization and reinitialization of the auto headlight beam leveler system. Auto Headlight Beam Leveler System > PROCEDURE |
Removal63
Malfunction of vehicle speed signal variation is detected.TROUBLE SYMPTOM:Cruise control cannot be set. (Cancelled immediately.)Refer to DTC 22 for diagnostic procedure. Diagnostic Procedure with Cancel Code > 22NOTE:When the vehicle was suddenly accelerated on low μ road surface while VDC is OFF ...