1. Install the power rear gate drive unit (PRG D/U). Tightening torque: 25 N·m (2.5 kgf-m, 18.4 ft-lb) 2. Install the trim panel - rear apron LH and trim panel - rear quarter trim UPR rear LH. 3. Install the rod - power rear gate. Power Rear Gate Rod > INSTALLATION 4. Connect the ground terminal to battery sensor. NOTE |
RemovalInspection
1. KEYLESS TRANSMITTER BATTERY1. Measure the keyless transmitter battery voltage.Preparation tool:Circuit testerNOTE:Complete the measurement within 5 seconds because the battery discharges during measurement.Battery terminalInspection ConditionsStandard(+) — (−)Connect resistor (A) 47 -2.5 ...