1. Install the EGR pipe to the intake manifold assembly and EGR control valve. NOTE: Use a new gasket. Tightening torque: 6.4 N·m (0.7 kgf-m, 4.7 ft-lb) 2. Install the throttle body. Throttle Body > INSTALLATION 3. Install the air intake boot. Air Intake Boot > INSTALLATION |
InspectionDtc p0052 a/f / o2 heater control circuit high bank 2 sensor 1
DTC DETECTING CONDITION:Immediately at fault recognitionCAUTION:After servicing or replacing faulty parts, perform Clear Memory Mode Clear Memory Mode > OPERATION, and Inspection Mode Inspection Mode > PROCEDURE.WIRING DIAGRAM:• Engine Electrical System ENGINE TYPE EZ (WITHOUT PUSH BUTTON ST ...