1. Measure the resistance between connector terminals. Preparation tool: Circuit tester
2. Apply battery voltage between the connector terminals to check lighting condition of illumination inside the switch.
3. Replace the power rear gate driver’s switch if the inspection result is not within the standard value. |
Removal
InstallationInstallation
1. Select shims for pulley alignment. Primary Pulley and Secondary Pulley > ADJUSTMENT2. Install the seal ring to the input shaft.NOTE:• Use new seal rings.• When installing the seal rings, do not expand the seal rings too much.• Apply CVTF to the seal rings.3. Install the seal ri ...