CAUTION: • Be sure to prevent water or oil from contacting the connector terminal of secondary pressure sensor. If adhesion occurs, replace with a new part. • After installing the secondary pressure sensor, adjust the CVTF level. 1. Install the secondary pressure sensor. NOTE: • Use new O-rings. Tightening torque: 39 N·m (4.0 kgf-m, 28.8 ft-lb) 2. Connect the harness connector. 3. Lower the vehicle. 4. Connect the ground terminal to battery sensor. NOTE Tightening torque: 39 N·m (4.0 kgf-m, 28.8 ft-lb) |
InspectionDtc b250b rotation sensor a stuck
DTC DETECTING CONDITION:When output of drive unit rotation sensor does not last for 1 sec during the auto-operation.TROUBLE SYMPTOM:The power rear gate does not operate.WIRING DIAGRAM:Power rear gate system Power Rear Gate System > WIRING DIAGRAMSTEPCHECKYESNO1.CHECK AUTO OPERATION.1) Turn the igni ...